The official page of the Municipality of Chisinau

Rehabilitation of the pedestrian alley in Alba - Iulia street, Buiucani District

   1033

Chisinau City Hall informs that on Tuesday, June 16, 2020, the asphalt layer was poured on the alley in Alba Iulia Street, Buiucani District the section "Delfin" Square -Soseaua Balcani. The landscaping works in the pedestrian area also provide for the rehabilitation of the lawn and the installation of urban furniture.  

The arrangement of the alley from Alba Iulia street started in April, 2020. During the mentioned period, several booths were evacuated, the released surfaces were leveled and the old asphalt layer was dismantled. Subsequently, new curbs were installed (about 2000 units), new gravel was laid and the wear layer was poured.

Currently, works are being carried out on the sidewalk protection areas after which the green spaces on the perimeter of the alley will be arranged.

The total length of the rehabilitated surface is 600m linear, and the width is 4m.